Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 18, 2015, 10:20 AM
  • 03 0315_03 0314_20151218_024340.mp4

Date
12/18/2015
W/O
531067
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00359
PipeID
P04889
Time
2:20 AM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K2894
Sewer Name
03 ANAHEIM STREET TRUNK
City
LONG BEACH, CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_531067_TV03106_DEC2015
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Lining Method
Segmented Panel
Shape
Circular
Height
30 in.
Upstream MH
03 0315
Downstream MH
03 0314
Dir. of Survey
Downstream
Length Surveyed
330.5 ft.
Total Length
330.5 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
320
O&M Index
5
O&M Quick
5100
O&M Rating
5
Overall Index
3
Overall Quick
Overall Rating
325
Pipe schematic from manhole 03 0315 to 03 0314
MH: 03 0315MH: 03 0314downstream0 ft. MGO - General Observation - CONNECTION AT MANHOLE ACTIVE 3 O'CLOCK0 ft. MWM - Water Mark, 80 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MANHOLE ACTIVE 3 O'CLOCK0 ft. MWL - Water Level, 70 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 03 03152 ft. MGO - General Observation - BEGIN MAGNESIUM HYDROXIDE COATING7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start320 ft. RPP - Repair Patch, from 11 to 01 o'clock, within 8 inches of joint: YES - PATCH327.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish327.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish330.5 ft. MGO - General Observation - CONNECTION AT MANHOLE ACTIVE 3 O'CLOCK330.5 ft. MGO - General Observation - CONNECTION AT MANHOLE ACTIVE 3 O'CLOCK330.5 ft. AMH - Downstream Manhole, Survey Ends - 03 0314

Observation photos (3)

  • General Observation - BEGIN MAGNESIUM HYDROXIDE COATING

    2 ft. - General Observation - BEGIN MAGNESIUM HYDROXIDE COATING

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    7 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Repair Patch, from 11 to 01 o'clock, within 8 inches of joint: YES - PATCH

    320 ft. - Repair Patch, from 11 to 01 o'clock, within 8 inches of joint: YES - PATCH

Observations (14)

DistanceCodeObservation
320RPPPATCH
0MGOCONNECTION AT MANHOLE ACTIVE 3 O'CLOCK
330.5MGOCONNECTION AT MANHOLE ACTIVE 3 O'CLOCK
7SSS
330.5MGOCONNECTION AT MANHOLE ACTIVE 3 O'CLOCK
0MWM
327.9SSS
7SAP
2MGOBEGIN MAGNESIUM HYDROXIDE COATING
327.9SAP
0MGOCONNECTION AT MANHOLE ACTIVE 3 O'CLOCK
0MWL
330.5AMH03 0314
0AMH03 0315

Properties (4)

additional_info
SC224472
custom_field_two
3
customer
LACSD
datetime
2015-12-18T02:20:00-08:00