Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 25, 2016, 10:20 AM
  • 14 0158_14 1128_10252016_032149.mp4

Date
10/25/2016
W/O
592016
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00584
PipeID
P26093
Time
3:20 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3792
Sewer Name
14 WEST SIDE TRUNK
City
LANCASTER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
10
Purpose
Routine Assessment
Project
WO_592016_TV14035_SEP2016
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0158
Downstream MH
14 1128
Dir. of Survey
Downstream
Length Surveyed
304.7 ft.
Total Length
304.7 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
300
O&M Index
2
O&M Quick
2K00
O&M Rating
120
Overall Index
2
Overall Quick
Overall Rating
420
Pipe schematic from manhole 14 0158 to 14 1128
MH: 14 0158MH: 14 1128downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 01580 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start5.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start21.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"24.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"70 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"73.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"121.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"124.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"169.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"172.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"221.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"224.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"269.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"272.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"303.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish303.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish303.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish304.7 ft. AMH - Downstream Manhole, Survey Ends - 14 1128

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    5.1 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
21.6TFC
172.9TFC
269.4TFC
121.6TFC
5.1SSS
0MWL
303.6SAP
272.5TFC
70TFC
73.8TFC
169.5TFC
0AMH14 0158
24.7TFC
303.6SSS
0MWM
2SAP
224.4TFC
2DAGS
221.8TFC
303.6DAGS
124.4TFC
304.7AMH14 1128

Properties (4)

additional_info
SC306330
custom_field_two
2
customer
LACSD
datetime
2016-10-25T03:20:43-07:00