D 0097_D 0096 _20161027_035852.mp4
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
2.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
17.6 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES
91.1 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES
307.8 ft. - Tap Break-In Intruding, at 03 o'clock, -, -, within 8 inches of joint: NO, 6", 3"
| Distance | Code | Observation |
|---|---|---|
| 17.6 | SAV | — |
| 0 | MWL | — |
| 0 | AMH | D 0097 |
| 313.1 | MGO | CONNECTION AT MH 9 O'CLOCK |
| 88.1 | SAV | — |
| 313.1 | DAGS | — |
| 2 | SSS | — |
| 2.2 | DAGS | — |
| 313.1 | SAP | — |
| 0 | MGO | CONNECTION AT MH 3 O'CLOCK |
| 0 | MWM | — |
| 315 | AMH | D 0096 |
| 307.8 | TBI | — |
| 91.1 | SRV | — |
| 0 | MGO | CONNECTION AT MH 9 O'CLOCK |
| 98.1 | SAP | — |
| 313.1 | SSS | — |
| 2 | MGO | MAGNESIUM H.O. START |