29 0771_29 0770_682017_080255.mp4
29 0771_29 0770_682017_080613.mp4
29 0771_29 0770_682017_081602.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
7 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES
20 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
35.2 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES
40.8 ft. - General Photograph - SPALLING
46.6 ft. - Crack Multiple, from 07 to 04 o'clock, within 8 inches of joint: YES
58.5 ft. - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES
64.2 ft. - Fracture Spiral, from 07 to 09 o'clock, within 8 inches of joint: YES
67.2 ft. - Crack Multiple, from 07 to 04 o'clock, within 8 inches of joint: YES
73.1 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES
90.8 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES
91.6 ft. - General Photograph - CHIPPING
93.8 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES
103.2 ft. - Material Change, Vitrified clay pipe
103.2 ft. - General Photograph
108 ft. - General Photograph - SPALLING
113 ft. - General Photograph
113 ft. - Material Change, Dictile Iron
144.5 ft. - General Photograph - SPALLING
| Distance | Code | Observation |
|---|---|---|
| 148.7 | CM | — |
| 46.6 | CM | — |
| 58.5 | CL | — |
| 148.7 | SSS | — |
| 56.5 | TF | — |
| 67.2 | CM | — |
| 0.1 | MWM | — |
| 90.8 | FL | — |
| 149.9 | MGO | ROACHES @ MH |
| 105.5 | TF | Open |
| 89.1 | TFA | — |
| 94.5 | TF | Open |
| 64.2 | FS | — |
| 149.9 | AMH | 8:46 AM |
| 103.2 | MMC | — |
| 2 | SSS | — |
| 91.6 | MGP | CHIPPING |
| 108 | MGP | SPALLING |
| 0 | MWL | — |
| 35.2 | CL | — |
| 108 | TF | Open |
| 2 | MGO | ROACHES @ MH |
| 0 | AMH | 7:50 AM |
| 40.8 | MGP | SPALLING |
| 73.1 | FL | — |
| 93.8 | FL | — |
| 7 | FM | — |
| 113 | MGP | — |
| 144.5 | MGP | SPALLING |
| 45 | TF | Open |
| 113 | MMC | — |
| 20 | CM | — |
| 103.2 | MGP | — |