Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 28, 2018, 08:35 AM
  • H 1229_H 1228 _09282018_013615.mp4

Date
09/28/2018
W/O
729644
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z01182
PipeID
P17653
Time
1:35 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6050
Sewer Name
H JOINT OUTFALL H - UNIT 8K RELIEF
City
IRWINDALE
Loc. details
Sidewalk
Location Code
F
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
19
Purpose
Routine Assessment
Project
RFIR_WO_729644_TV15222_OCT2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
H 1229
Downstream MH
H 1228
Dir. of Survey
Downstream
Length Surveyed
427.1 ft.
Total Length
427.1 ft.
Structural Index
3
Structural Quick
3P2P
Structural Rating
425
O&M Index
2
O&M Quick
2P00
O&M Rating
170
Overall Index
2
Overall Quick
Overall Rating
595
Pipe schematic from manhole H 1229 to H 1228
MH: H 1229MH: H 1228downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 12290 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start340.6 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"384 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"425.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish425.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish425.1 ft. MGO - General Observation - COCKROACHES IN MANHOLE425.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish427.1 ft. AMH - Downstream Manhole, Survey Ends - H 1228

Observation photos (4)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    425.1 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (13)

DistanceCodeObservation
425.1SSS
0MWL
2SSS
427.1AMHH 1228
425.1DAGS
0AMHH 1229
0MWM
425.1MGOCOCKROACHES IN MANHOLE
425.1SAP
2SAP
384TBA
2DAGS
340.6TFA

Properties (5)

additional_info
SC365113
custom_field_two
2
customer
LACSD
datetime
2018-09-28T01:35:45-07:00
year_laid
30904