Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 15, 2018, 07:37 AM
  • 01 0741_01 0740A_10152018_043421.mp4

Date
10/15/2018
W/O
#
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00205
PipeID
P01649
Time
12:37 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1013
Sewer Name
01 COMPTON DISPOSAL TRUNK
City
COMPTON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
20
Purpose
Capital Improvement Program Assesment
Project
20181015MDM_COMPTON_DISPOSAL_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
01 0740A
Downstream MH
01 0741
Dir. of Survey
Upstream
Length Surveyed
70.9 ft.
Total Length
70.9 ft.
Structural Index
3
Structural Quick
3221
Structural Rating
8
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
8
Pipe schematic from manhole 01 0740A to 01 0741
MH: 01 0740AMH: 01 0741upstream0 ft. AMH - Downstream Manhole, Survey Ends - 4:35AM0.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE0.4 ft. MGO - General Observation - MAG COAT 70% FINISH0.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG23.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG68.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE68.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG68.9 ft. MGO - General Observation - MAG COAT 60% START 8:00 TO 4:0070.9 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active70.9 ft. MWM - Water Mark, 30 %of cross sectional area70.9 ft. AMH - Downstream Manhole, Survey Begins - 4:25AM70.9 ft. MWL - Water Level, 10 %of cross sectional area

Observation photos (4)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • General Observation - MAG COAT 60% START 8:00 TO 4:00

    2 ft. - General Observation - MAG COAT 60% START 8:00 TO 4:00

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    47.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

Observations (12)

DistanceCodeObservation
2SSSBLISTERING PEELING CONCRETE
70.5SSSBLISTERING PEELING CONCRETE
0MGOConn. @ Mh, 3 O' Clock. Active
0MWM
70.5MGOMAG COAT 70% FINISH
2SAPSEVERE AGG
0AMH4:25AM
70.9AMH4:35AM
2MGOMAG COAT 60% START 8:00 TO 4:00
0MWL
70.5SAPSEVERE AGG
47.3SAPSEVERE AGG

Properties (4)

custom_field_three
SEVERE AGG PROJECTING
custom_field_two
3
customer
LACSD
datetime