Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 12, 2018, 05:56 PM
  • 01 0742_01 0741A_10122018_130125.mp4

Date
10/12/2018
W/O
PENDING
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00205
PipeID
P01651
Time
10:56 AM
Certificate
U-1014-06022541
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1011
Sewer Name
01 COMPTON DISPOSAL TRUNK
City
COMPTON
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
20
Purpose
Capital Improvement Program Assesment
Project
20181012SHO_COMPTON_DISPOSAL_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
01 0742
Downstream MH
01 0741A
Dir. of Survey
Downstream
Length Surveyed
158.3 ft.
Total Length
158.3 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 01 0742 to 01 0741A
MH: 01 0742MH: 01 0741Adownstream0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - MH 07420 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION @ 3 IN THE MH8.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start8.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start10.9 ft. MGO - General Observation - 40% MAG COAT INTACT158.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish158.3 ft. AMH - Downstream Manhole, Survey Ends - MH 741A158.3 ft. MGO - General Observation - ACTIVE CONENCTION @ 9 IN THE MH158.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    8.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    8.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
10.9MGO40% MAG COAT INTACT
158.3SSS
0MWL
8.6SSS
0AMHMH 0742
0MWM
158.3AMHMH 741A
158.3MGOACTIVE CONENCTION @ 9 IN THE MH
158.3SAP
8.5SAP
0MGOACTIVE CONNECTION @ 3 IN THE MH

Properties (4)

custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
LACSD
datetime
2018-10-12T10:56:39-07:00