Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 17, 2018, 10:18 AM
  • 08 0303_08 0302_09172018_032043.mp4

Date
09/17/2018
W/O
723785
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00013
PipeID
P00349
Time
3:18 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6028
Sewer Name
08 KEYSTONE TRUNK
City
CARSON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
10
Purpose
Routine Assessment
Project
WO_723785_TV08154_SEP2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
08 0303
Downstream MH
08 0302
Dir. of Survey
Downstream
Length Surveyed
220.3 ft.
Total Length
220.3 ft.
Structural Index
3
Structural Quick
3G00
Structural Rating
126
O&M Index
2
O&M Quick
2H00
O&M Rating
86
Overall Index
2
Overall Quick
Overall Rating
212
Pipe schematic from manhole 08 0303 to 08 0302
MH: 08 0303MH: 08 0302downstream0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 08 03032 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start4.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start39.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"64.3 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"134.3 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"169.9 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"207.5 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"214.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish217.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish220.3 ft. AMH - Downstream Manhole, Survey Ends - 08 0302220.3 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (4)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    220.3 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (15)

DistanceCodeObservation
214.9CM
0MGOCOCKROACHES IN MANHOLE
220.3AMH08 0302
217.7DAGS
64.3TF
0MWL
0MWM
220.3MGOCOCKROACHES IN MANHOLE
2DAGS
4.9CM
0AMH08 0303
169.9TFA
134.3TF
207.5TF
39.2TFC

Properties (4)

additional_info
SC364792
custom_field_two
2
customer
LACSD
datetime
2018-09-17T03:18:42-07:00