- Date
- 08/29/2018
- W/O
- 724118
- Weather
- Dry
- Operator/Surveyor
- B.FUGATE
- Sewer ID
- Z00286
- PipeID
- P18796
- Time
- 4:05 AM
- Certificate
- U-508-7069
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- No Pre-Cleaning
- Media Label
- K5990
- Sewer Name
- 02 MONTEBELLO RELIEF TRUNK, SECTS 1&2
- City
- COMMERCE
- Loc. details
- Main Highway - Urban
- Location Code
- A
- Use of Sewer
- Sanitary Sewer
- District
- District 02
- Page No.
- 20
- Purpose
- Routine Assessment
- Project
- WO_724118_TV02362_SEP2018
- Sewer Type
- Siphon
- Material
- NRCP
- Shape
- Circular
- Height
- 12 in.
- Width
- 12 in.
- Upstream MH
- 02 1529
- Downstream MH
- 02 1528
- Dir. of Survey
- Downstream
- Length Surveyed
- 2.1 ft.
- Total Length
- 2.1 ft.
- Structural Index
- 3
- Structural Quick
- 3100
- Structural Rating
- 3
- O&M Index
- 5
- O&M Quick
- 5100
- O&M Rating
- 5
- Overall Index
- 4
- Overall Quick
- —
- Overall Rating
- 8
Pipe schematic from manhole 02 1529 to 02 1528 Observation photos (3)

2.1 ft. - Deposits Settled Other, 45 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO

2.1 ft. - Survey Abandoned - DOWN LEG OF THE U/S SIPHON

2.1 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO