22 0844_22 0843_10102018_032056.mp4
2 ft. - General Observation - MAG COAT 20% START 8:00 TO 4:00
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE
15.5 ft. - Surface Aggregate Visible, from 01 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG
15.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PELING CONCRETE
25.7 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC
62.2 ft. - Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
154.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO
257.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - MULTIPLE LAYER PEELING CONCRETE
263.4 ft. - General Observation - 18" RCP
378.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE
404.6 ft. - Deposits Settled Other, 5 %of cross sectional area, from 04 to 06 o'clock, , within 8 inches of joint: YES, - PEELING CONCRETE PIPE
| Distance | Code | Observation |
|---|---|---|
| 0 | AMH | 3:25AM |
| 15.5 | SAV | SEVERE AGG |
| 257.3 | SSS | MULTIPLE LAYER PEELING CONCRETE |
| 442.3 | SAV | SEVERE AGG |
| 363.7 | TF | Active |
| 251 | TF | Active |
| 323.8 | TFC | Capped |
| 442.3 | SSS | PEELING CONCRETE |
| 2 | MGO | MAG COAT 20% START 8:00 TO 4:00 |
| 378.1 | SSS | PEELING CONCRETE |
| 0 | MGO | Conn. @ Mh, 9 O' Clock. Active |
| 0 | MGO | Conn. @ Mh, 3 O' Clock. OPEN |
| 442.8 | AMH | 4:05AM |
| 428.4 | TF | Open |
| 2 | SSS | PEELING CONCRETE |
| 404.6 | DSZ | PEELING CONCRETE PIPE |
| 25.7 | SAV | SEVERE AGG SPORATIC |
| 263.4 | MGO | 18" RCP |
| 15.9 | SSS | PELING CONCRETE |
| 62.2 | SAV | SEVERE AGG |
| 0 | MWM | — |
| 154.6 | SSS | — |
| 0 | MWL | — |
| 211 | TF | Open |