Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 5, 2018, 07:59 AM
  • H 1339_H 1338_1052018_053842.mp4

Date
10/05/2018
W/O
0731552
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z01184
PipeID
P25882
Time
12:59 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Heavy Cleaning
Media Label
H0997
Sewer Name
H JOINT OUTFALL H - UNIT 8L RELIEF
City
AZUSA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
12
Purpose
Maintenance Related
Project
20181005MDM_JOINT_OUTFALL_H_UNIT_8L_RELIEF
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Upstream MH
H 1339
Downstream MH
H 1338
Dir. of Survey
Downstream
Length Surveyed
120.8 ft.
Total Length
120.8 ft.
Structural Index
2
Structural Quick
5131
Structural Rating
26
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
26
Pipe schematic from manhole H 1339 to H 1338
MH: H 1339MH: H 1338downstream0 ft. AMH - Upstream Manhole, Survey Begins - 5:30AM0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area1 ft. MGO - General Observation - PEELED VCP FROM CLEANING10 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING VCP17.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING VCP17.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO21.3 ft. B - Broken, from 10 to 12 o'clock, within 8 inches of joint: NO - SLIGHT FRACTURE21.3 ft. FC - Fracture Circumferential, from 09 to 03 o'clock, within 8 inches of joint: NO - SLIGHT21.3 ft. FC - Fracture Circumferential, from 10 to 12 o'clock, within 8 inches of joint: NO - SLIGHT24.1 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES - SLIGHT25.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING VCP32.1 ft. SSS - Surface Spalling, from 08 to 11 o'clock, within 8 inches of joint: NO - SMALL INDENTSIONS48.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING VCP55 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - SMALL INDENTSIONS55 ft. MGP - General Photograph88.8 ft. MGP - General Photograph107.3 ft. MGP - General Photograph120.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - PEELING VCP120.8 ft. MSA - Survey Abandoned - 6:05AM

Observation photos (15)

  • General Observation - PEELED VCP FROM CLEANING

    1 ft. - General Observation - PEELED VCP FROM CLEANING

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING VCP

    10 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING VCP

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING VCP

    17.9 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING VCP

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO

    17.9 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO

  • Broken, from 10 to 12 o'clock, within 8 inches of joint: NO - SLIGHT FRACTURE

    21.3 ft. - Broken, from 10 to 12 o'clock, within 8 inches of joint: NO - SLIGHT FRACTURE

  • Fracture Circumferential, from 10 to 12 o'clock, within 8 inches of joint: NO - SLIGHT

    21.3 ft. - Fracture Circumferential, from 10 to 12 o'clock, within 8 inches of joint: NO - SLIGHT

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES - SLIGHT

    24.1 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES - SLIGHT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING VCP

    25.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING VCP

  • Surface Spalling, from 08 to 11 o'clock, within 8 inches of joint: NO - SMALL INDENTSIONS

    32.1 ft. - Surface Spalling, from 08 to 11 o'clock, within 8 inches of joint: NO - SMALL INDENTSIONS

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING VCP

    48.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING VCP

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - SMALL INDENTSIONS

    55 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - SMALL INDENTSIONS

  • General Photograph

    55 ft. - General Photograph

  • General Photograph

    88.8 ft. - General Photograph

  • General Photograph

    107.3 ft. - General Photograph

  • Survey Abandoned - 6:05AM

    120.8 ft. - Survey Abandoned - 6:05AM

Observations (20)

DistanceCodeObservation
107.3MGP
10SSSPEELING VCP
1MGOPEELED VCP FROM CLEANING
48.1SSSPEELING VCP
24.1FLSLIGHT
120.1SSSPEELING VCP
0AMH5:30AM
0MWM
17.9SSSPEELING VCP
0MWL
25.1SSSPEELING VCP
21.3BSLIGHT FRACTURE
21.3FCSLIGHT
120.8MSA6:05AM
55SSSSMALL INDENTSIONS
88.8MGP
21.3FCSLIGHT
17.9SSS
55MGP
32.1SSSSMALL INDENTSIONS

Properties (3)

additional_info
POST CLEANING
customer
LACSD
datetime
2018-10-05T00:59:50-07:00