Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 28, 2018, 08:55 AM
  • 16 0313_16 0312_9282018_021922.mp4

Date
09/28/2018
W/O
07229304
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00665
PipeID
P13364
Time
1:55 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0990
Sewer Name
16 SAN MARINO OUTFALL TRUNK
City
ALHAMBRA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
21
Purpose
Capital Improvement Program Assesment
Project
20180928MDM_SAN_MARINO_OUTFALL_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Upstream MH
16 0313
Downstream MH
16 0312
Dir. of Survey
Downstream
Length Surveyed
72.9 ft.
Total Length
72.9 ft.
Structural Index
2
Structural Quick
4124
Structural Rating
12
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
14
Pipe schematic from manhole 16 0313 to 16 0312
MH: 16 0313MH: 16 0312downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 2:20AM8 ft. MGO - General Observation - 18" VCP12.3 ft. FC - Fracture Circumferential, from 09 to 01 o'clock, within 8 inches of joint: YES - HAIRLINE14.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open26.6 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open-90% ROOTS45.9 ft. FC - Fracture Circumferential, from 11 to 01 o'clock, within 8 inches of joint: YES - SLIGHT47.9 ft. FC - Fracture Circumferential, from 11 to 12 o'clock, within 8 inches of joint: YES - H50.7 ft. FM - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES - H59.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open68.5 ft. FC - Fracture Circumferential, from 01 to 03 o'clock, within 8 inches of joint: YES - H72.6 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active72.9 ft. AMH - Downstream Manhole, Survey Ends - 2:35AM

Observation photos (1)

  • Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES - H

    50.7 ft. - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES - H

Observations (14)

DistanceCodeObservation
0MWL
14.7TFOpen
26.6TFDOpen-90% ROOTS
68.5FCH
8MGO18" VCP
50.7FMH
72.9AMH2:35AM
47.9FCH
0MWM
72.6MGOConn. @ Mh, 9 O' Clock. Active
0AMH2:20AM
12.3FCHAIRLINE
59.4TFOpen
45.9FCSLIGHT

Properties (4)

custom_field_three
SLIGHT FRACTURES
custom_field_two
3
customer
LACSD
datetime
2018-09-28T01:55:27-07:00