Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 15, 2017, 09:19 AM
  • 05 1032_D 0211 _15122017_011916.mp4

Date
12/15/2017
W/O
674039
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00156
PipeID
P22752
Time
1:19 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5280
Sewer Name
D JOINT OUTFALL D - UNIT 6
City
REDONDO BEACH
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
16
Purpose
Routine Assessment
Project
WO_674039_TV05166_DEC2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
D 0211
Downstream MH
05 1032
Dir. of Survey
Upstream
Length Surveyed
12.6 ft.
Total Length
12.7 ft.
Structural Index
3
Structural Quick
3222
Structural Rating
10
O&M Index
3
O&M Quick
3200
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
16
Pipe schematic from manhole D 0211 to 05 1032
MH: D 0211MH: 05 1032upstream0 ft. MSA - Survey Abandoned - CAM BLKD BY SLUDGE0.1 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Finish - SLUDGE0.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish10.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start10.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start10.5 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start12.7 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK12.7 ft. MGO - General Observation - CONNECTION AT MH 1 O'CLOCK12.7 ft. MWL - Water Level, 25 %of cross sectional area12.7 ft. AMH - Downstream Manhole, Survey Begins - D 021112.7 ft. MWM - Water Mark, 30 %of cross sectional area

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Other,  20 %of cross sectional area, at 06 o'clock,  , within 8 inches of joint: YES, Start

    2.2 ft. - Deposits Settled Other, 20 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
2.2SAP
0MGOCONNECTION AT MH 9 O'CLOCK
12.7MSACAM BLKD BY SLUDGE
0MGOCONNECTION AT MH 1 O'CLOCK
0MWL
12.6DSZSLUDGE
0AMHD 0211
2.2SSS
0MWM
12.6SAP
12.6SSS
2.2DSZ

Properties (4)

additional_info
SC346757
custom_field_two
5
customer
LACSD
datetime
2017-12-15T01:19:07-08:00