Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 25, 2018, 08:46 PM
  • A 0822_A 0439_9252018_135448.mp4

Date
09/25/2018
W/O
PENDING
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00323
PipeID
P08162
Time
1:46 PM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7818
Sewer Name
A JOA-1A LOS COYOTES WRP INTERCEPTOR
City
BELL GARDENS
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
26
Purpose
Routine Assessment
Project
20180925DF_JOA_1A_LOS_COYOTES_WRP_INTERCEPTOR
Material
Reinforced Concrete Pipe
Shape
Circular
Height
60 in.
Upstream MH
A 0822
Downstream MH
A 0439
Dir. of Survey
Downstream
Length Surveyed
2.1 ft.
Total Length
2.1 ft.
Structural Index
3
Structural Quick
5133
Structural Rating
16
O&M Index
4
O&M Quick
5141
O&M Rating
11
Overall Index
3
Overall Quick
Overall Rating
27
Pipe schematic from manhole A 0822 to A 0439
MH: A 0822MH: A 0439downstream0 ft. MWL - Water Level, 100 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 1:49 PM0 ft. MWM - Water Mark, 100 %of cross sectional area2 ft. LD - Alignment Down, 45 %2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES2 ft. OBM - Obstacles Pipe Material, 10 %of cross sectional area, at 10 o'clock2 ft. SCP - Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES - 65% MAG2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES2 ft. MGP - General Photograph2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES2 ft. MGP - General Photograph2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES2.1 ft. MSA - Survey Abandoned - 2:05 PM

Observation photos (8)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Obstacles Pipe Material, 10 %of cross sectional area, at 10 o'clock

    2 ft. - Obstacles Pipe Material, 10 %of cross sectional area, at 10 o'clock

  • Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES

  • General Photograph

    2 ft. - General Photograph

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

  • General Photograph

    2 ft. - General Photograph

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (14)

DistanceCodeObservation
0MWL
0AMH1:49 PM
2LD
0MWM
2.1MSA2:05 PM
2SSS
2OBM
2SCP
2SZ65% MAG
2SRV
2MGP
2SAP
2MGP
2SAV

Properties (4)

additional_info
VIEW OF DOWNLEG FROM THE U/S SIPHON
custom_field_two
1
customer
LACSD
datetime
2018-09-25T13:46:33-07:00