- Date
- 09/25/2018
- W/O
- PENDING
- Weather
- Dry
- Operator/Surveyor
- FRANKLIN
- Sewer ID
- Z00323
- PipeID
- P08162
- Time
- 11:39 AM
- Certificate
- U-415-06024039
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- Not Known
- Media Label
- G7818
- Sewer Name
- A JOA-1A LOS COYOTES WRP INTERCEPTOR
- City
- DOWNEY
- Loc. details
- Other
- Location Code
- Z
- Use of Sewer
- Sanitary Sewer
- District
- District 02
- Page No.
- 26
- Purpose
- Routine Assessment
- Project
- 20180925DF_JOA_1A_LOS_COYOTES_WRP_INTERCEPTOR
- Material
- Reinforced Concrete Pipe
- Shape
- Circular
- Height
- 60 in.
- Upstream MH
- A 0439
- Downstream MH
- A 0822
- Dir. of Survey
- Upstream
- Length Surveyed
- 2.1 ft.
- Total Length
- 2.1 ft.
- Structural Index
- 2
- Structural Quick
- 2100
- Structural Rating
- 2
- O&M Index
- 5
- O&M Quick
- 5141
- O&M Rating
- 9
- Overall Index
- 4
- Overall Quick
- —
- Overall Rating
- 11
Pipe schematic from manhole A 0439 to A 0822 Observation photos (6)

0 ft. - Downstream Manhole, Survey Begins - 12:41 AM

2 ft. - Alignment Up, 45 %

2 ft. - General Photograph

2 ft. - General Photograph

2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES - 35% MAG