Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 21, 2018, 08:04 PM
  • H 0401A_H 0401_9212018_130801.mp4

Date
09/21/2018
W/O
0729413
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00177
PipeID
P10831
Time
1:04 PM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7815
Sewer Name
H JOINT OUTFALL H - UNIT 5A
City
INDUSTRY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
01
Purpose
Capital Improvement Program Assesment
Project
20180920DF_JOINT_OUTFALL_H_UNIT_5A
Material
Reinforced Concrete Pipe
Shape
Circular
Height
60 in.
Upstream MH
H 0401A
Downstream MH
H 0401
Dir. of Survey
Downstream
Length Surveyed
462.5 ft.
Total Length
462.5 ft.
Structural Index
4
Structural Quick
5232
Structural Rating
18
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
18
Pipe schematic from manhole H 0401A to H 0401
MH: H 0401AMH: H 0401downstream0 ft. AMH - Upstream Manhole, Survey Begins - 1:05 PM0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SRC - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 60% MAG2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start42.7 ft. MGP - General Photograph123.3 ft. MGP - General Photograph124.4 ft. MGP - General Photograph225.2 ft. MGP - General Photograph225.3 ft. MGP - General Photograph328.9 ft. MGP - General Photograph457.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish458 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish458 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish458 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 65% MAG458 ft. SRC - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish458 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish462.5 ft. AMH - Downstream Manhole, Survey Ends - 1:24 PM462.5 ft. MGO - General Observation - Peeling & Flaking Throughout The Reach462.5 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)

Observation photos (12)

  • Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 60% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 60% MAG

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    42.7 ft. - General Photograph

  • General Photograph

    123.3 ft. - General Photograph

  • General Photograph

    124.4 ft. - General Photograph

  • General Photograph

    225.2 ft. - General Photograph

  • General Photograph

    225.3 ft. - General Photograph

  • General Photograph

    328.9 ft. - General Photograph

Observations (24)

DistanceCodeObservation
2SRC
458SSS
0AMH1:05 PM
462.5AMH1:24 PM
225.2MGP
123.3MGP
0MWM
2SAV
462.5MGOPeeling & Flaking Throughout The Reach
462.5MGOGREASE THROUGHOUT THE REACH (5%)
2SSS
225.3MGP
328.9MGP
2SZ60% MAG
0MWL
457.9SAV
2SAP
42.7MGP
458SRV
458SZ65% MAG
458SRC
2SRV
124.4MGP
458SAP

Properties (3)

custom_field_two
2
customer
LACSD
datetime
2018-09-21T13:04:03-07:00