Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 21, 2018, 04:59 PM
  • H 0412_ H 0799_9212018_100941.mp4

Date
09/21/2018
W/O
0729413
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00177
PipeID
P20498
Time
9:59 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7815
Sewer Name
H JOINT OUTFALL H - UNIT 5A
City
INDUSTRY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
01
Purpose
Capital Improvement Program Assesment
Project
20180920DF_JOINT_OUTFALL_H_UNIT_5A
Material
Reinforced Concrete Pipe
Shape
Circular
Height
57 in.
Upstream MH
H 0412
Downstream MH
H 0799
Dir. of Survey
Downstream
Length Surveyed
591.7 ft.
Total Length
591.7 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole H 0412 to H 0799
MH: H 0412MH: H 0799downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 10:05 AM0 ft. MWL - Water Level, 25 %of cross sectional area2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 80% MAG2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start52.8 ft. MGP - General Photograph123.6 ft. MGP - General Photograph191.8 ft. MGP - General Photograph220.6 ft. MGP - General Photograph271.8 ft. MGP - General Photograph398.1 ft. MGP - General Photograph500.7 ft. MGP - General Photograph541.9 ft. MGP - General Photograph580.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"584 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish584 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 80% MAG591.7 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)591.7 ft. MGO - General Observation - Peeling & Flaking Throughout The Reach591.7 ft. AMH - Downstream Manhole, Survey Ends - 10:48 AM

Observation photos (11)

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 80% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 80% MAG

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    52.8 ft. - General Photograph

  • General Photograph

    123.6 ft. - General Photograph

  • General Photograph

    191.8 ft. - General Photograph

  • General Photograph

    220.6 ft. - General Photograph

  • General Photograph

    271.8 ft. - General Photograph

  • General Photograph

    398.1 ft. - General Photograph

  • General Photograph

    500.7 ft. - General Photograph

  • General Photograph

    541.9 ft. - General Photograph

  • Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"

    580.8 ft. - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"

Observations (19)

DistanceCodeObservation
591.7MGOGREASE THROUGHOUT THE REACH (5%)
191.8MGP
0MWM
591.7MGOPeeling & Flaking Throughout The Reach
220.6MGP
2SZ80% MAG
0AMH10:05 AM
580.8TFA
584SAV
541.9MGP
123.6MGP
584SZ80% MAG
271.8MGP
500.7MGP
398.1MGP
591.7AMH10:48 AM
0MWL
52.8MGP
2SAV

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2018-09-21T09:59:43-07:00