E 0110_E 0109_9242018_082940.mp4
E 0110_E 0109_9242018_095140.mp4
2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 55% MAG
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
8.1 ft. - General Photograph
18.1 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
31.6 ft. - General Photograph - AGGREGATE
31.7 ft. - General Photograph
95 ft. - General Photograph
180.8 ft. - General Photograph
360.4 ft. - General Photograph
420.4 ft. - General Photograph
| Distance | Code | Observation |
|---|---|---|
| 31.7 | MGP | — |
| 0 | MWM | — |
| 180.8 | MGP | — |
| 430 | AMH | 9:56 AM |
| 428.4 | SZ | 55% MAG |
| 95 | MGP | — |
| 0 | AMH | 8:20 AM |
| 31.6 | MGP | AGGREGATE |
| 420.4 | MGP | — |
| 428.4 | SRV | — |
| 428.4 | SAV | — |
| 0 | MGP | — |
| 360.4 | MGP | — |
| 2 | SZ | 55% MAG |
| 2 | SSS | — |
| 0 | MWL | — |
| 2 | SAV | — |
| 430 | MGO | Peeling & Flaking Throughout The Reach |
| 18.1 | SRV | — |
| 8.1 | MGP | — |
| 430 | MGO | GREASE THROUGHOUT THE REACH (5%) |
| 428.4 | SSS | — |