Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 20, 2017, 05:38 PM
  • J 0269_J 0268_02132017_020135.mpg

Date
01/20/2017
W/O
619078
Weather
Dry
Operator/Surveyor
JUAN B
Sewer ID
Z00059
PipeID
P11508
Time
9:38 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K4264
Sewer Name
J JOINT OUTFALL J - UNIT 1G
City
PALOS VERDES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
46
Purpose
Routine Assessment
Project
WO_619078_TV05169_FEB2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
J 0269
Downstream MH
J 0268
Dir. of Survey
Downstream
Length Surveyed
295 ft.
Total Length
295 ft.
Structural Index
2
Structural Quick
2D11
Structural Rating
55
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
57
Pipe schematic from manhole J 0269 to J 0268
MH: J 0269MH: J 0268downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - J 02690 ft. MWM - Water Mark, 40 %of cross sectional area4.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start4.6 ft. MGO - General Observation - MAG COATING4.7 ft. SRI - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start161.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start243.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"295 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish295 ft. SRI - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish295 ft. AMH - Downstream Manhole, Survey Ends - J 0268295 ft. MGO - General Observation - CONNECTION AT 9 O CLOCK295 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish295 ft. MGO - General Observation - CAPPED CONNECTION 3 O CLOCK

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    4.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.7 ft. - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    161.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
295DAGS
243.4TF
4.7SRI
161.8SSS
295SRI
295AMHJ 0268
0MWL
4.6DAGS
0AMHJ 0269
295MGOCONNECTION AT 9 O CLOCK
295SSS
295MGOCAPPED CONNECTION 3 O CLOCK
4.6MGOMAG COATING
0MWM

Properties (4)

additional_info
SC318715
custom_field_two
3
customer
LACSD
datetime
2017-01-20T09:38:10-08:00