Wastewater/Activity/PacpInspection/1.0Jan 24, 2017, 07:06 AM
  • 14 0471_14 0470 _01232017_232817.mp4

Date
01/23/2017
W/O
618867
Weather
Dry
Operator/Surveyor
S LOPEZ
Sewer ID
Z00580
PipeID
P18560
Time
11:06 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4219
Sewer Name
14 TRUNK "D"
City
LANCASTER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
21
Purpose
Routine Assessment
Project
WO_618867_TV14023_FEB2017
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
14 0471
Downstream MH
14 0470
Dir. of Survey
Downstream
Length Surveyed
338.4 ft.
Total Length
338.4 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
201
O&M Index
2
O&M Quick
2L00
O&M Rating
134
Overall Index
3
Overall Quick
Overall Rating
335
Pipe schematic from manhole 14 0471 to 14 0470
MH: 14 0471MH: 14 0470downstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 04710 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 22 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start31.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"56 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"79.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"103.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"128.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"152.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"180.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"204.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"246 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"277.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"289.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"338.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish338.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish338.4 ft. AMH - Downstream Manhole, Survey Ends - 14 0470

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 2

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 2

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
103.9TFC
0AMH14 0471
246TFC
0MWM
2SAP2
338.3SAP
79.7TFC
128.1TFC
204.9TFA
2DAGS
56TF
289.9TFC
180.8TFC
338.4AMH14 0470
0MWL
31.4TFC
152.1TFC
338.3DAGS
277.8TFC

Properties (4)

additional_info
SC306721
custom_field_two
3
customer
LACSD
datetime
2017-01-23T23:06:22-08:00