Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 22, 2017, 09:58 AM
  • C 0320_C 0319 _22092017_025924.mpg

Date
09/22/2017
W/O
657894
Weather
Dry
Operator/Surveyor
CORTEZ ESTEBAN
Sewer ID
Z00136
PipeID
P09783
Time
2:58 AM
Certificate
U-209-8148
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4936
Sewer Name
C JOINT OUTFALL C - UNIT 6G
City
ARTESIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
40
Project
WO_657894_TV02311_SEP2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
C 0320
Downstream MH
C 0319
Dir. of Survey
Downstream
Length Surveyed
264.7 ft.
Total Length
264.7 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole C 0320 to C 0319
MH: C 0320MH: C 0319downstream0 ft. AMH - Upstream Manhole, Survey Begins - C 03200 ft. MWL - Water Level, 5 %of cross sectional area0.1 ft. MWM - Water Mark, 15 %of cross sectional area0.1 ft. MGO - General Observation - MAGNEZIUM H.O COATING start227.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"233.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6"241.8 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6"262.9 ft. MGO - General Observation - MAGNEZIUM H.O COATING finish264.7 ft. AMH - Downstream Manhole, Survey Ends - C 0319264.7 ft. MGO - General Observation - SERVICE CONNECTION AT 12 O' CLOCK AT MH

Observations (10)

DistanceCodeObservation
227.4TFC
0AMHC 0320
262.9MGOMAGNEZIUM H.O COATING finish
0MWL
0.1MWM
0.1MGOMAGNEZIUM H.O COATING start
264.7AMHC 0319
264.7MGOSERVICE CONNECTION AT 12 O' CLOCK AT MH
241.8TF
233.2TFC

Properties (4)

additional_info
SC345884
custom_field_two
4
customer
LACSD
datetime