05 0341_05 0340 _21112017_014843.mp4
6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES
21.7 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Start
38 ft. - Deposits Settled Compacted, 15 %of cross sectional area, from 11 to 01 o'clock, , within 8 inches of joint: YES
65.3 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Start
125.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Start
173.8 ft. - Deposits Settled Compacted, 10 %of cross sectional area, from 11 to 01 o'clock, , within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 418.7 | SAP | — |
| 173.8 | DSC | — |
| 125.1 | SRV | — |
| 0 | MWL | — |
| 420.3 | AMH | 05 0340 |
| 65.2 | SAP | — |
| 0 | MGO | CONNECTION AT MH 3 O'CLOCK |
| 0 | MWM | — |
| 6 | SAP | — |
| 38 | DSC | — |
| 0 | AMH | 05 0341 |
| 65.3 | SRV | — |
| 125.1 | SAP | — |
| 419 | MGO | Surface Spalling throughout the reach, from 9 to 3 oclock |
| 21.7 | SAP | — |