Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 4, 2017, 12:34 PM
  • 02 1715_02 1714_01042017_043513.mp4

Date
01/04/2017
W/O
613349
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00289
PipeID
P18878
Time
4:34 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4049
Sewer Name
02 MONTEREY PARK EXTENSION TRUNK
City
MONTEREY PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
06
Purpose
Routine Assessment
Project
WO_613349_TV02103_JAN2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
02 1715
Downstream MH
02 1714
Dir. of Survey
Downstream
Length Surveyed
331.3 ft.
Total Length
331.3 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2L00
O&M Rating
132
Overall Index
2
Overall Quick
Overall Rating
132
Pipe schematic from manhole 02 1715 to 02 1714
MH: 02 1715MH: 02 1714downstream0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 17152 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start23.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"29.9 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"112.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"173.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"192.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"227.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"268.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"271.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"312.7 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: YES, 4"314.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"317.2 ft. TBC - Tap Break-In Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"327.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish331.3 ft. MGO - General Observation - COCKROACHES IN MANHOLE331.3 ft. AMH - Downstream Manhole, Survey Ends - 02 1714

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    331.3 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (19)

DistanceCodeObservation
327.3DAGS
227.7TFA
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
112.3TFA
0MWL
2DAGS
23.2TFC
317.2TBC
192.9TFA
29.9TB
0MWM
314.5TFC
331.3MGOCOCKROACHES IN MANHOLE
271.5TF
0AMH02 1715
331.3AMH02 1714
268.1TFA
312.7TBA
173.2TFA

Properties (4)

additional_info
SC306447
custom_field_two
4
customer
LACSD
datetime
2017-01-04T04:34:54-08:00