Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 28, 2016, 08:15 AM
  • 03 0395_03 0394 _12282016_002921.mp4

Date
12/28/2016
W/O
613343
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00371
PipeID
P04970
Time
12:15 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3901
Sewer Name
03 MARINA TRUNK, SECTION 2
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
25
Purpose
Routine Assessment
Project
WO_613343_TV03019_JAN2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
03 0395
Downstream MH
03 0394
Dir. of Survey
Downstream
Length Surveyed
327 ft.
Total Length
327 ft.
Structural Index
1
Structural Quick
1300
Structural Rating
3
O&M Index
2
O&M Quick
2L00
O&M Rating
128
Overall Index
2
Overall Quick
Overall Rating
131
Pipe schematic from manhole 03 0395 to 03 0394
MH: 03 0395MH: 03 0394downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK CAPPED0 ft. AMH - Upstream Manhole, Survey Begins - 03 03950 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 10 %of cross sectional area2.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start136.7 ft. CC - Crack Circumferential, from 02 to 04 o'clock, within 8 inches of joint: YES160.2 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: YES, 8"279.3 ft. CC - Crack Circumferential, from 03 to 04 o'clock, within 8 inches of joint: YES282.6 ft. CC - Crack Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES323.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish326.9 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK CAPPED327 ft. AMH - Downstream Manhole, Survey Ends - 03 0394

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.7 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Circumferential, from 02 to 04 o'clock, within 8 inches of joint: YES

    136.7 ft. - Crack Circumferential, from 02 to 04 o'clock, within 8 inches of joint: YES

  • Crack Circumferential, from 03 to 04 o'clock, within 8 inches of joint: YES

    279.3 ft. - Crack Circumferential, from 03 to 04 o'clock, within 8 inches of joint: YES

  • Crack Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES

    282.6 ft. - Crack Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (12)

DistanceCodeObservation
2.7DAGS
0MGOCONNECTION AT MH 9 O'CLOCK CAPPED
160.2TBA
327AMH03 0394
282.6CC
326.9MGOCONNECTION AT MH 9 O'CLOCK CAPPED
0AMH03 0395
0MWL
136.7CC
323.3DAGS
279.3CC
0MWM

Properties (4)

additional_info
SC305242
custom_field_two
3
customer
LACSD
datetime
2016-12-28T00:15:33-08:00