Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 9, 2016, 09:10 AM
  • 22 0879_22 0878 _20160909_022421.mp4

Date
09/09/2016
W/O
591686
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00798
PipeID
P17248
Time
2:10 AM
Certificate
U-109-7948
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3426
Sewer Name
22 CONEY TRUNK, SECTION 1
City
AZUSA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
11
Purpose
Routine Assessment
Project
WO_591686_TV22132_SEP2016
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0879
Downstream MH
22 0878
Dir. of Survey
Downstream
Length Surveyed
358.1 ft.
Total Length
358.1 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 22 0879 to 22 0878
MH: 22 0879MH: 22 0878downstream0 ft. MGO - General Observation - CONNECTION AT MH 3 ACTIVE0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 08790 ft. MGO - General Observation - CONNECTION AT MH 9 ACTIVE0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. MGO - General Observation - MAG. H.OX 90% START61.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"69.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"109.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"141.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"149.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"190 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"214 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"238.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"254.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"262.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"271.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"310.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"355.4 ft. MGO - General Observation - MAG. H.OX 90% FINISH358.1 ft. MGO - General Observation - CONNECTION AT MH 3 ACTIVE358.1 ft. AMH - Downstream Manhole, Survey Ends - 22 0878

Observations (21)

DistanceCodeObservation
109.3TF
262.5TF
61.2TF
0MGOCONNECTION AT MH 3 ACTIVE
238.4TFC
190TF
358.1MGOCONNECTION AT MH 3 ACTIVE
149.7TF
2MGOMAG. H.OX 90% START
358.1AMH22 0878
141.6TF
0MWL
0AMH22 0879
0MGOCONNECTION AT MH 9 ACTIVE
214TF
69.1TF
0MWM
254.4TFC
271.6TF
355.4MGOMAG. H.OX 90% FINISH
310.9TF

Properties (4)

additional_info
SC305990
custom_field_two
4
customer
LACSD
datetime
2016-09-09T02:10:42-07:00