Section#9_B 0191_B 0190__9202018__I0074.mp4
2 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
2 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2 ft. - General Observation - MAG COAT 90% START
4.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
180.9 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG
311.8 ft. - General Observation - MAG COAT 98% START
367.7 ft. - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - OPEN
| Distance | Code | Observation |
|---|---|---|
| 0 | AMH | 5:30AM |
| 4.5 | DAGS | — |
| 491.6 | MGO | MAG COAT 98% FINISH |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 491.6 | SAP | SEVERE AGG |
| 0 | MWM | — |
| 367.7 | TF | OPEN |
| 180.9 | SAP | SEVERE AGG |
| 0 | MWL | — |
| 491.6 | SSS | BLISTERING PEELING CONCRETE |
| 311.8 | MGO | MAG COAT 98% START |
| 2 | SAP | SEVERE AGG |
| 2 | MGO | MAG COAT 90% START |
| 491.6 | DAGS | — |
| 491.9 | AMH | 5:55AM |