Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 20, 2018, 08:18 AM
  • Section#6_B 0185_H 0344__9202018__I0073.mp4

Date
09/20/2018
W/O
0730226
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00075
PipeID
P22104
Time
1:18 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0073
Sewer Name
B JOINT OUTFALL B - UNIT 1D
City
WHITTIER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
19
Purpose
Routine Assessment
Project
20180919_JOINT_OUTFALL_B_UNIT_1D
Material
Reinforced Concrete Pipe
Shape
Circular
Height
54 in.
Upstream MH
H 0344
Downstream MH
B 0185
Dir. of Survey
Upstream
Length Surveyed
3.9 ft.
Total Length
3.9 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
4
Overall Quick
Overall Rating
7
Pipe schematic from manhole H 0344 to B 0185
MH: H 0344MH: B 0185upstream0 ft. AMH - Upstream Manhole, Survey Ends - 2:55AM1.9 ft. MGO - General Observation - MONITORING RING IN PLACE1.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG3.9 ft. AMH - Downstream Manhole, Survey Begins - 2:45AM3.9 ft. MWL - Water Level, 30 %of cross sectional area3.9 ft. MGO - General Observation - STOPLOG IN MH# H3443.9 ft. MWM - Water Mark, 60 %of cross sectional area3.9 ft. MGO - General Observation - 3 METERS IN MH# B185

Observation photos (2)

  • General Observation - MONITORING RING IN PLACE

    2 ft. - General Observation - MONITORING RING IN PLACE

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

Observations (8)

DistanceCodeObservation
0AMH2:45AM
0MWL
0MGOSTOPLOG IN MH# H344
2MGOMONITORING RING IN PLACE
0MWM
3.9AMH2:55AM
2SAPSEVERE AGG
0MGO3 METERS IN MH# B185

Properties (4)

custom_field_three
SEVERE AGG PROJECTING
custom_field_two
3
customer
LACSD
datetime
2018-09-20T01:18:08-07:00