Wastewater/Activity/PacpInspection/1.0Jan 31, 2017, 08:52 AM
  • 20 0125_20 0124 _01312017_005759.mp4

Date
01/31/2017
W/O
618961
Weather
Dry
Operator/Surveyor
JUAN B
Sewer ID
Z00744
PipeID
P19048
Time
12:52 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K4225
Sewer Name
20 TRUNK "C"
City
PALMDALE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
01
Purpose
Routine Assessment
Project
WO_618961_TV20027_FEB2017
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
20 0125
Downstream MH
20 0124
Dir. of Survey
Downstream
Length Surveyed
374.6 ft.
Total Length
374.6 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
375
O&M Index
2
O&M Quick
2N00
O&M Rating
150
Overall Index
2
Overall Quick
Overall Rating
525
Pipe schematic from manhole 20 0125 to 20 0124
MH: 20 0125MH: 20 0124downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 01252 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start11 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"15.3 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 4"20.3 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: NO, 4"115.9 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"119.6 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 4"213.1 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"217.2 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 4"314.9 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"319.1 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 4"374.6 ft. SSS - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish374.6 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish374.6 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish374.6 ft. AMH - Downstream Manhole, Survey Ends - 20 0124

Observation photos (3)

  • Deposits Attached Grease, 10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
2DAGS
15.3TFC
374.6SSS
217.2TFC
2SAV
374.6DAGS
0MWM
2SSS
11TFC
0MWL
20.3TBA
213.1TFC
319.1TFC
0AMH20 0125
374.6SAV
119.6TFC
314.9TFC
115.9TFC
374.6AMH20 0124

Properties (4)

additional_info
SC306727
custom_field_two
2
customer
LACSD
datetime
2017-01-31T00:52:16-08:00