- Date
- 01/10/2018
- W/O
- 0682841
- Weather
- Dry
- Operator/Surveyor
- IGNACIO
- Sewer ID
- Z00816
- PipeID
- P16799
- Time
- 9:52 AM
- Certificate
- PENDING
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- Not Known
- Media Label
- G7600
- Sewer Name
- 22 LARK ELLEN TRUNK, SECTS 4,5,&6
- City
- COVINA
- Loc. details
- Light Highway
- Location Code
- C
- Use of Sewer
- Sanitary Sewer
- District
- District 22
- Page No.
- 19
- Purpose
- Capital Improvement Program Assesment
- Project
- 20180110MI_LARK_ELLEN_TRUNK_SECTS_1_2_6
- Material
- NRCP
- Shape
- Circular
- Height
- 18 in.
- Upstream MH
- 22 0461
- Downstream MH
- 22 0460
- Dir. of Survey
- Downstream
- Length Surveyed
- 341.7 ft.
- Total Length
- 341.7 ft.
- Structural Index
- 3
- Structural Quick
- 3100
- Structural Rating
- 3
- O&M Index
- 0
- O&M Quick
- 0000
- O&M Rating
- 0
- Overall Index
- 3
- Overall Quick
- —
- Overall Rating
- 3
Pipe schematic from manhole 22 0461 to 22 0460 Observation photos (4)

3 ft. - General Observation - POSSIBLE MAGNESIUM HYDROXIDE COAT, 9 TO 3 OCLOCK, 25%

62.3 ft. - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 6" - Open

62.9 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

341.7 ft. - Downstream Manhole, Survey Ends - 10:35 AM