Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 4, 2016, 07:20 AM
  • 01 0676_01 0675_04102016_002028.mp4

Date
10/04/2016
W/O
591536
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00199
PipeID
P01385
Time
12:20 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3598
Sewer Name
01 CALIFORNIA AVENUE EXTENSION TRUNK
City
SOUTH GATE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
14
Purpose
Routine Assessment
Project
WO_591536_TV01117_SEP2016
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
01 0676
Downstream MH
01 0675
Dir. of Survey
Downstream
Length Surveyed
403 ft.
Total Length
403 ft.
Structural Index
4
Structural Quick
5N3O
Structural Rating
622
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
4
Overall Quick
Overall Rating
624
Pipe schematic from manhole 01 0676 to 01 0675
MH: 01 0676MH: 01 0675downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 06760 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK3.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Start3.4 ft. MGO - General Observation - MAG COAT 60%13.7 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start380.6 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: NO399.5 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish399.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish403 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK403 ft. AMH - Downstream Manhole, Survey Ends - 01 0675

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

    3.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    13.7 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Other,  10 %of cross sectional area, at 06 o'clock,  , within 8 inches of joint: NO

    380.6 ft. - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: NO

Observations (12)

DistanceCodeObservation
0MWL
13.7SRV
399.5SRV
3.4SAP
403MGOCONNECTION AT MH 9 O'CLOCK
403AMH01 0675
3.4MGOMAG COAT 60%
0AMH01 0676
0MWM
380.6DSZ
399.5SAP
0MGOCONNECTION AT MH 9 O'CLOCK

Properties (4)

additional_info
SC306193
custom_field_two
2
customer
LACSD
datetime
2016-10-04T00:20:12-07:00