Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 4, 2016, 07:00 AM
  • 01 0677_01 0676_04102016_000056.mp4

Date
10/04/2016
W/O
591536
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00199
PipeID
P01386
Time
12:00 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3598
Sewer Name
01 CALIFORNIA AVENUE EXTENSION TRUNK
City
SOUTH GATE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
14
Purpose
Routine Assessment
Project
WO_591536_TV01117_SEP2016
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
01 0677
Downstream MH
01 0676
Dir. of Survey
Downstream
Length Surveyed
471.5 ft.
Total Length
471.5 ft.
Structural Index
3
Structural Quick
543Q
Structural Rating
293
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
293
Pipe schematic from manhole 01 0677 to 01 0676
MH: 01 0677MH: 01 0676downstream0 ft. AMH - Upstream Manhole, Survey Begins - 01 06770 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area11 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Start35.6 ft. SRV - Surface Reinforcement Visible, at 11 o'clock, within 8 inches of joint: YES90.8 ft. SRV - Surface Reinforcement Visible, at 01 o'clock, within 8 inches of joint: NO314.6 ft. SRV - Surface Reinforcement Visible, from 09 to 11 o'clock, within 8 inches of joint: NO404.8 ft. SRV - Surface Reinforcement Visible, from 09 to 11 o'clock, within 8 inches of joint: NO467.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish471.5 ft. AMH - Downstream Manhole, Survey Ends - 01 0676471.5 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (5)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

    11 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

  • Surface Reinforcement Visible, at 11 o'clock, within 8 inches of joint: YES

    35.6 ft. - Surface Reinforcement Visible, at 11 o'clock, within 8 inches of joint: YES

  • Surface Reinforcement Visible, at 01 o'clock, within 8 inches of joint: NO

    90.8 ft. - Surface Reinforcement Visible, at 01 o'clock, within 8 inches of joint: NO

  • Surface Reinforcement Visible, from 09 to 11 o'clock, within 8 inches of joint: NO

    314.6 ft. - Surface Reinforcement Visible, from 09 to 11 o'clock, within 8 inches of joint: NO

  • Surface Reinforcement Visible, from 09 to 11 o'clock, within 8 inches of joint: NO

    404.8 ft. - Surface Reinforcement Visible, from 09 to 11 o'clock, within 8 inches of joint: NO

Observations (11)

DistanceCodeObservation
90.8SRV
11SAP
0AMH01 0677
0MWL
404.8SRV
314.6SRV
471.5AMH01 0676
35.6SRV
467.3SAP
471.5MGOCONNECTION AT MH 9 O'CLOCK
0MWM

Properties (4)

additional_info
SC306193
custom_field_two
2
customer
LACSD
datetime
2016-10-04T00:00:26-07:00