Wastewater/Activity/PacpInspection/1.0May 7, 2018, 07:35 AM
  • 18 0897_18 0896_572018_005419.mp4

Date
05/07/2018
W/O
0701634
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00709
PipeID
P14748
Time
12:35 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
HO852
Sewer Name
18 SO WHITTIER OUTFALL RLF TR, SECTS 1,2A,2B,2C,&3
City
NORWALK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
26
Purpose
Routine Assessment
Project
20180507MDM_SO_WHITTIER_OUTFALL_RLF_TR_SECTS_1_2A_2B_2C_3
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
18 0897
Downstream MH
18 0896
Dir. of Survey
Downstream
Length Surveyed
476.8 ft.
Total Length
476.8 ft.
Structural Index
4
Structural Quick
5641
Structural Rating
70
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
70
Pipe schematic from manhole 18 0897 to 18 0896
MH: 18 0897MH: 18 0896downstream0 ft. AMH - Upstream Manhole, Survey Begins - 12:45AM0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE9.6 ft. SAP - Surface Aggregate Projecting, from 02 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG9.6 ft. SAP - Surface Aggregate Projecting, from 08 to 10 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG13.9 ft. SRC - Surface Reinforcement Corroded, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR14.2 ft. SRC - Surface Reinforcement Corroded, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - CIRCUMM REBAR17.9 ft. SAP - Surface Aggregate Projecting, from 08 to 10 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG17.9 ft. SRC - Surface Reinforcement Corroded, from 08 to 09 o'clock, within 8 inches of joint: YES, Finish - CIRCUM REBAR17.9 ft. SRC - Surface Reinforcement Corroded, from 03 to 04 o'clock, within 8 inches of joint: YES, Finish - CIRCUM REBAR17.9 ft. SAP - Surface Aggregate Projecting, from 02 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG25.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE29.4 ft. SAV - Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEV ER AGG PORATIC29.4 ft. SAV - Surface Aggregate Visible, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC31.8 ft. SRC - Surface Reinforcement Corroded, from 02 to 04 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR33.5 ft. SAM - Surface Aggregate Missing, from 02 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG33.5 ft. SRV - Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: YES, Start - LONG REBAR33.5 ft. SAV - Surface Aggregate Visible, from 03 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG38.5 ft. SRV - Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: YES, Finish - LONG REBAR38.5 ft. SRC - Surface Reinforcement Corroded, from 02 to 04 o'clock, within 8 inches of joint: YES, Finish - CIRCUM REBAR62.8 ft. SAV - Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG62.8 ft. SAP - Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG62.8 ft. SAP - Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG62.8 ft. SAM - Surface Aggregate Missing, from 02 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG81.1 ft. SRV - Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: YES - LONG CIRCUUM REBAR125.3 ft. SAV - Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC125.3 ft. SAV - Surface Aggregate Visible, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC125.3 ft. SAP - Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG125.3 ft. SAP - Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG125.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - BLISTERING PEELING CONCRETE154 ft. MWM - Water Mark, 40 %of cross sectional area189.6 ft. MWM - Water Mark, 30 %of cross sectional area219.4 ft. SRV - Surface Reinforcement Visible, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR227.1 ft. SRV - Surface Reinforcement Visible, from 03 to 04 o'clock, within 8 inches of joint: YES, Finish - LOMG CIRCUM REBAR445.4 ft. SAP - Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: NO - SEVERE AGG472.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVESRE AGG476.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE476.3 ft. SAV - Surface Aggregate Visible, from 03 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG SPORATIC476.3 ft. SAV - Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG SPORATIC476.8 ft. AMH - Downstream Manhole, Survey Ends - 1:45AM

Observation photos (21)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Aggregate Projecting, from 02 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    9.6 ft. - Surface Aggregate Projecting, from 02 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Projecting, from 08 to 10 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    9.6 ft. - Surface Aggregate Projecting, from 08 to 10 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Reinforcement Corroded, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR

    13.9 ft. - Surface Reinforcement Corroded, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR

  • Surface Reinforcement Corroded, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - CIRCUMM REBAR

    14.2 ft. - Surface Reinforcement Corroded, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - CIRCUMM REBAR

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE

    25.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE

  • Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEV ER AGG PORATIC

    29.4 ft. - Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEV ER AGG PORATIC

  • Surface Aggregate Visible, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

    29.4 ft. - Surface Aggregate Visible, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

  • Surface Reinforcement Corroded, from 02 to 04 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR

    31.8 ft. - Surface Reinforcement Corroded, from 02 to 04 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR

  • Surface Aggregate Missing, from 02 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    33.5 ft. - Surface Aggregate Missing, from 02 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: YES, Start - LONG REBAR

    33.5 ft. - Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: YES, Start - LONG REBAR

  • Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    62.8 ft. - Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    62.8 ft. - Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: YES - LONG CIRCUUM REBAR

    81.1 ft. - Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: YES - LONG CIRCUUM REBAR

  • Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

    125.3 ft. - Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

  • Surface Aggregate Visible, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

    125.3 ft. - Surface Aggregate Visible, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - BLISTERING PEELING CONCRETE

    125.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - BLISTERING PEELING CONCRETE

  • Water Mark, 40 %of cross sectional area

    154 ft. - Water Mark, 40 %of cross sectional area

  • Surface Reinforcement Visible, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR

    219.4 ft. - Surface Reinforcement Visible, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR

  • Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: NO - SEVERE AGG

    445.4 ft. - Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVESRE AGG

    472.9 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVESRE AGG

Observations (41)

DistanceCodeObservation
38.5SRVLONG REBAR
154MWM
445.4SAPSEVERE AGG
476.3SSSBLISTERING PEELING CONCRETE
227.1SRVLOMG CIRCUM REBAR
17.9SAPSEVERE AGG
31.8SRCCIRCUM REBAR
62.8SAVSEVERE AGG
17.9SRCCIRCUM REBAR
476.3SAVSEVERE AGG SPORATIC
81.1SRVLONG CIRCUUM REBAR
14.2SRCCIRCUMM REBAR
125.3SAVSEVERE AGG SPORATIC
9.6SAPSEVERE AGG
125.3SAVSEVERE AGG SPORATIC
25.6SSSPEELING CONCRETE
125.3SAPSEVERE AGG
29.4SAVSEV ER AGG PORATIC
472.9SAVSEVESRE AGG
62.8SAPSEVERE AGG
0AMH12:45AM
219.4SRVLONG CIRCUM REBAR
33.5SAMSEVERE AGG
33.5SRVLONG REBAR
476.3SAVSEVERE AGG SPORATIC
33.5SAVSEVERE AGG
476.8AMH1:45AM
29.4SAVSEVERE AGG SPORATIC
189.6MWM
62.8SAPSEVERE AGG
2SSSBLISTERING PEELING CONCRETE
125.3SAPSEVERE AGG
17.9SRCCIRCUM REBAR
9.6SAPSEVERE AGG
0MWL
125.3SSSBLISTERING PEELING CONCRETE
13.9SRCCIRCUM REBAR
38.5SRCCIRCUM REBAR
0MWM
62.8SAMSEVERE AGG
17.9SAPSEVERE AGG

Properties (4)

custom_field_three
LONG & CIRCUM REBAR VISIBLE & CORRODED
custom_field_two
2
customer
LACSD
datetime
2018-05-07T00:35:16-07:00