Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 6, 2016, 10:08 AM
  • 01 0167_01 0166_06092016_030927.mp4

Date
09/06/2016
W/O
585995
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00202
PipeID
P01193
Time
3:08 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3579
Sewer Name
01 COMPTON AVENUE TRUNK
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
13
Purpose
Routine Assessment
Project
WO_585995_TV01012_AUG2016
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
01 0167
Downstream MH
01 0166
Dir. of Survey
Downstream
Length Surveyed
303.5 ft.
Total Length
303.6 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole 01 0167 to 01 0166
MH: 01 0167MH: 01 0166downstream0 ft. MGO - General Observation - LATERAL AT MH 9 OCLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 01 01670 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 10 %of cross sectional area12.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"12.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"58.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"89.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"122 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"127.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"165.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"167.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"215.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"223.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"236.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"271.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"298 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, at 12 o'clock, , within 8 inches of joint: NO303.6 ft. MGO - General Observation - LATERAL AT MH 9 OCLOCK303.6 ft. MGO - General Observation - LATERAL AT MH 3 OCLOCK303.6 ft. AMH - Downstream Manhole, Survey Ends - 01 0166

Observation photos (3)

  • Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"

    12.6 ft. - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"

    89.3 ft. - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"

  • Deposits Settled Other,  5 %of cross sectional area, at 12 o'clock,  , within 8 inches of joint: NO

    298 ft. - Deposits Settled Other, 5 %of cross sectional area, at 12 o'clock, , within 8 inches of joint: NO

Observations (20)

DistanceCodeObservation
0MGOLATERAL AT MH 9 OCLOCK
303.6MGOLATERAL AT MH 9 OCLOCK
165.4TF
215.8TF
0AMH01 0167
122TFC
298DSZ
89.3TF
0MWL
303.6MGOLATERAL AT MH 3 OCLOCK
236.6TFC
58.6TF
127.3TF
0MWM
167.9TFC
271.7TFC
12.5TFC
12.6TF
303.6AMH01 0166
223.8TFA

Properties (4)

additional_info
SC306169
custom_field_two
4
customer
LACSD
datetime
2016-09-06T03:08:04-07:00