Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 30, 2016, 09:19 AM
  • F_01 COMPTON AVENUE TRUNK_01 0198LOS ANGELES_SI_TapeLocation.mpg

Date
08/30/2016
W/O
585995
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00202
PipeID
P01240
Time
2:19 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3575
Sewer Name
01 COMPTON AVENUE TRUNK
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
10
Purpose
Routine Assessment
Project
WO_585995_TV01012_AUG2016
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
01 0198
Downstream MH
01 0197
Dir. of Survey
Downstream
Length Surveyed
323 ft.
Total Length
323 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole 01 0198 to 01 0197
MH: 01 0198MH: 01 0197downstream0 ft. AMH - Upstream Manhole, Survey Begins - 01 01980 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - LATERAL AT MH 3 OCLOCK2.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start51.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"60.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"75 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"86.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"116.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"140 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"145.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"147.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"171.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"204.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"222.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"231.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"233.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"235.9 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"254.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"284.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"308.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"318.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish323 ft. AMH - Downstream Manhole, Survey Ends - 01 0197323 ft. MGO - General Observation - lLATERAL AT MH 9 OCLOCK

Observation photos (2)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.7 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"

    235.9 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"

Observations (25)

DistanceCodeObservation
140TF
147.9TF
2.7CM
254.4TFC
308.1TF
222.7TF
284.4TF
0AMH01 0198
75TFC
145.6TFC
231.1TF
0MWL
323AMH01 0197
0MWM
318.7CM
116.3TF
86.7TFC
0MGOLATERAL AT MH 3 OCLOCK
235.9TB
204.8TFC
171.8TF
51.6TFC
233.5TFC
323MGOlLATERAL AT MH 9 OCLOCK
60.2TFC

Properties (4)

additional_info
SC306165
custom_field_two
3
customer
LACSD
datetime
2016-08-30T02:19:20-07:00