Section#10_G 0314_G 0313__9112018__I0066.mp4
2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG AREAS OF MISSING TILES
2 ft. - General Observation - MAG COAT 80% START 8:00 TO 4:00
2 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - MISSING TILES SLUDGE
2 ft. - Surface Reinforcement Corroded, from 09 to 01 o'clock, within 8 inches of joint: NO - BROKEN CIRCUM REBAR
8.7 ft. - General Observation - 80% MISSING TILES START
68.5 ft. - General Observation - 20% MISSING TILES START
104.3 ft. - General Observation - 100% MISSING TILES 1PIPE JPOINT
112.7 ft. - General Observation - 1 NEW MISSING TILE
133.5 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - BROKEN CICURM REBAR
176 ft. - General Observation - 90% MISSING TILES 1 PIPE JOINT
195.4 ft. - General Observation - 90% MISSING TILES 3 PIPE JOINTS
254.9 ft. - General Observation - 30% MISSING TILES START
278.1 ft. - General Observation - 90% MISSING TILES START
| Distance | Code | Observation |
|---|---|---|
| 2 | SAM | SEVERE AGG AREAS OF MISSING TILES |
| 300.2 | MGO | 90% MISSING TILES FINISH |
| 195.4 | MGO | 90% MISSING TILES 3 PIPE JOINTS |
| 68.5 | MGO | 20% MISSING TILES START |
| 0 | MWM | — |
| 300.2 | SAM | SEVERE AGG AREAS OF MISSING TILES |
| 104.3 | MGO | 100% MISSING TILES 1PIPE JPOINT |
| 283.8 | SRC | CURCUM REBAR |
| 112.7 | MGO | 1 NEW MISSING TILE |
| 300.2 | MGO | 80% MAG COAT FINISH |
| 176 | MGO | 90% MISSING TILES 1 PIPE JOINT |
| 148.6 | MGO | 100% MISSING TILES 2 PIPE JOINT |
| 0 | AMH | 5:30AM |
| 300.8 | AMH | 6:00 AM |
| 0 | MWL | — |
| 254.9 | MGO | 30% MISSING TILES START |
| 266.7 | MGO | 90% MISSING TILES 2 PIPE JOINTS |
| 278.1 | MGO | 90% MISSING TILES START |
| 300.2 | DSZ | MISSING TILES SLUDGE |
| 2 | MGO | MAG COAT 80% START 8:00 TO 4:00 |
| 8.7 | MGO | 80% MISSING TILES START |
| 235.1 | MGO | 100% MISSING TILES 2 PIPE JOINTS |
| 300.2 | MGO | MH CONN 9:00 ACTIVE |
| 2 | DSZ | MISSING TILES SLUDGE |
| 2 | SRC | BROKEN CIRCUM REBAR |
| 79.7 | DAGS | — |
| 133.5 | SRC | BROKEN CICURM REBAR |
| 218.8 | MGO | 90% MISSING TILES 2 PIPE JOINTS |
| 131.9 | MGO | 100% MISSING TILES 2 PIPE JOINTS |
| 2 | MGO | 90% MISSING TILES START |