Section#8_G 0316_G 0315__9112018__I0065.mp4
2 ft. - General Observation - 10% MISSING TILES START
4.7 ft. - General Observation - 90% MISSING TILES 1 PIPE JOINT
6.8 ft. - Surface Reinforcement Corroded, from 08 to 12 o'clock, within 8 inches of joint: NO, Start - LONG CIRCUM REBAR
14.7 ft. - General Observation - 95% MAG COAT 8:00 TO 4:00 START
21 ft. - General Observation - 90% MISSINT TILES 1 PIPE JOINT
36.4 ft. - General Observation - 70% MISSING TILES 2 PIPE JOINTS
48.6 ft. - General Observation - 50% MISSING TILES 1 PIPE JOINT
48.6 ft. - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO - MISSING TILES SLUDGE
78.5 ft. - General Observation - 90% MISSING TILES 2 PIPE JOINT
94.1 ft. - Surface Reinforcement Visible, from 10 to 12 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
105.9 ft. - General Observation - 100% MISSING TILES 1 PIPE JOINT
125.5 ft. - General Observation - 100% MISSING TILES 2 PIPE JOINTS
132.9 ft. - General Observation - 50% NEW MISSING TILES
156.8 ft. - General Observation - 30% NEW MISSING TILES
| Distance | Code | Observation |
|---|---|---|
| 94.1 | SRV | CIRCUM REBAR |
| 14.7 | MGO | 95% MAG COAT 8:00 TO 4:00 START |
| 78.5 | MGO | 90% MISSING TILES 2 PIPE JOINT |
| 36.4 | MGO | 70% MISSING TILES 2 PIPE JOINTS |
| 9.9 | SRC | LONG CIRCUM REBAR |
| 156.8 | MGO | 30% NEW MISSING TILES |
| 132.9 | MGO | 50% NEW MISSING TILES |
| 197.6 | AMH | 4:25AM |
| 0 | MWL | — |
| 105.9 | MGO | 100% MISSING TILES 1 PIPE JOINT |
| 2 | MGO | 10% MISSING TILES START |
| 125.5 | MGO | 100% MISSING TILES 2 PIPE JOINTS |
| 48.6 | MGO | 50% MISSING TILES 1 PIPE JOINT |
| 4.7 | MGO | 90% MISSING TILES 1 PIPE JOINT |
| 48.6 | DSZ | MISSING TILES SLUDGE |
| 6.8 | SRC | LONG CIRCUM REBAR |
| 197 | DSZ | MISSING TILES SLUDGE |
| 21 | MGO | 90% MISSINT TILES 1 PIPE JOINT |
| 163.8 | MGO | 40% MISSING TILES |
| 0 | MWM | — |
| 2 | SAM | SEVERE AGG AREAS OF MISSING TILES |
| 197 | MGO | 10% MISSING TILES FINISH |
| 2 | DSZ | MISSING TILES SLUDGE |
| 153.1 | MGO | 90% MISSING TILES 1 PIPE JOINT |
| 197 | SAM | SEVERE AGG AREAS OF MISSING TILES |
| 138.1 | MGO | 80% MISSING TILES 1 PIPE JOINT |
| 94.1 | MGO | 90% MISSING TILES 1 PIPE JOINT |
| 0 | AMH | 3:55AM |
| 197 | MGO | 95% MAG COAT FINISH |