Section#4_G O320_G 0319__972018__I0064.mp4
2 ft. - General Observation - MAG COAT 90% START
2 ft. - General Observation - MISSING TILES 30% START
2 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - TILES & SLUDGE
2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT
28.5 ft. - General Observation - NEW MISSING TILE
45.8 ft. - General Observation - 50% MISSING TILES START
58.6 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
80.5 ft. - General Observation - NEW MISSING TILES
| Distance | Code | Observation |
|---|---|---|
| 28.5 | MGO | NEW MISSING TILE |
| 0 | MWM | — |
| 0 | MWL | — |
| 172.1 | SAM | SEVERE AGG UNDER MAG COAT |
| 2 | MGO | MAG COAT 90% START |
| 45.8 | MGO | 50% MISSING TILES START |
| 172.1 | MGO | MAG COAT 90% FINISH |
| 172.1 | MGO | MISSING TILES 30% FINISH |
| 2 | MGO | MISSING TILES 30% START |
| 172.7 | AMH | 5:45AM |
| 58.6 | SAM | SEVERE AGG |
| 172.1 | DSZ | TILES & SLUDGE |
| 2 | DSZ | TILES & SLUDGE |
| 80.5 | MGO | NEW MISSING TILES |
| 0 | AMH | 5:30AM |
| 2 | SAM | SEVERE AGG UNDER MAG COAT |
| 0 | MGO | MH CONN 9:00 ACTIVE |
| 0 | MGO | MH CONN 3:00 ACTIVE |
| 62.8 | MGO | MISSING TILES 30% START |