Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 9, 2018, 08:26 AM
  • B 0620_B 0619 _09052018_014150.mp4

Date
05/09/2018
W/O
696325
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00106
PipeID
P09285
Time
1:26 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5588
Sewer Name
B JOINT OUTFALL B - UNIT 8C
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
16
Purpose
Routine Assessment
Project
WO_696325_TV15228_APR2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
B 0620
Downstream MH
B 0619
Dir. of Survey
Downstream
Length Surveyed
406.2 ft.
Total Length
406.2 ft.
Structural Index
3
Structural Quick
3O2O
Structural Rating
405
O&M Index
2
O&M Quick
2O00
O&M Rating
162
Overall Index
2
Overall Quick
Overall Rating
567
Pipe schematic from manhole B 0620 to B 0619
MH: B 0620MH: B 0619downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. AMH - Upstream Manhole, Survey Begins - B 06202 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start405.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish405.1 ft. MGO - General Observation - COCKROACHES IN MANHOLE405.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish405.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish406.2 ft. AMH - Downstream Manhole, Survey Ends - B 0619

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
2SSS
0MWM
0MWL
406.2AMHB 0619
2DAGS
2SAP
405.1DAGS
405.1MGOCOCKROACHES IN MANHOLE
405.1SAP
0MGOCOCKROACHES IN MANHOLE
405.1SSS
0AMHB 0620

Properties (4)

additional_info
SC359354
custom_field_two
2
customer
LACSD
datetime
2018-05-09T01:26:53-07:00