Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 9, 2018, 08:42 AM
  • B 0619_B 0618 _09052018_021311.mp4

Date
05/09/2018
W/O
696325
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00106
PipeID
P09284
Time
1:42 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5588
Sewer Name
B JOINT OUTFALL B - UNIT 8C
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
16
Purpose
Routine Assessment
Project
WO_696325_TV15228_APR2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
B 0619
Downstream MH
B 0618
Dir. of Survey
Downstream
Length Surveyed
403.8 ft.
Total Length
403.8 ft.
Structural Index
3
Structural Quick
3O2O
Structural Rating
400
O&M Index
2
O&M Quick
2O00
O&M Rating
160
Overall Index
2
Overall Quick
Overall Rating
560
Pipe schematic from manhole B 0619 to B 0618
MH: B 0619MH: B 0618downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. AMH - Upstream Manhole, Survey Begins - B 06190 ft. MGO - General Observation - MAG COATING THROUGHOUT 60%0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start403.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish403.8 ft. MGO - General Observation - ACTIVE CONNECTIONS AT MH 9 AND 12 O'CLOCK403.8 ft. AMH - Downstream Manhole, Survey Ends - B 0618403.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish403.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish403.8 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
0MWL
2SAP
403.8DAGS
0MGOCOCKROACHES IN MANHOLE
0AMHB 0619
0MGOMAG COATING THROUGHOUT 60%
403.8MGOACTIVE CONNECTIONS AT MH 9 AND 12 O'CLOCK
2DAGS
0MWM
403.8AMHB 0618
2SSS
403.8SAP
403.8SSS
403.8MGOCOCKROACHES IN MANHOLE

Properties (4)

additional_info
SC359354
custom_field_two
2
customer
LACSD
datetime
2018-05-09T01:42:03-07:00