Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 20, 2017, 07:01 AM
  • 02 1086_02 1085 _19122017_230145.mp4

Date
12/19/2017
W/O
679272
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00282
PipeID
P03660
Time
11:01 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5284
Sewer Name
02 MONTEBELLO DIVERSION TRUNK
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
18
Purpose
Routine Assessment
Project
WO_679272_TV02212_JAN2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
02 1086
Downstream MH
02 1085
Dir. of Survey
Downstream
Length Surveyed
317.7 ft.
Total Length
317.7 ft.
Structural Index
3
Structural Quick
3L2K
Structural Rating
319
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
319
Pipe schematic from manhole 02 1086 to 02 1085
MH: 02 1086MH: 02 1085downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 10860 ft. MWL - Water Level, 5 %of cross sectional area2.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES2.6 ft. MGO - General Observation - MAG COAT3.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start25.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"122.2 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"172.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"228.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"277.8 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"277.9 ft. SAP - Surface Aggregate Projecting, from 11 to 01 o'clock, within 8 inches of joint: YES317.7 ft. AMH - Downstream Manhole, Survey Ends - 02 1085317.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish317.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (4)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES

    2.6 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.6 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 11 to 01 o'clock, within 8 inches of joint: YES

    277.9 ft. - Surface Aggregate Projecting, from 11 to 01 o'clock, within 8 inches of joint: YES

Observations (16)

DistanceCodeObservation
277.8TF
172.6TFC
2.6SAP
317.7AMH02 1085
228.9TFC
0MWM
2.6MGOMAG COAT
6.1SSS
0AMH02 1086
317.7SSS
317.7SAV
3.6SAV
0MWL
122.2TFA
25.7TFC
277.9SAP

Properties (4)

additional_info
SC346761
custom_field_two
3
customer
LACSD
datetime
2017-12-19T23:01:41-08:00