Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 17, 2017, 09:34 AM
  • 29 0271_29 0270_17032017_023745.mpg

Date
03/17/2017
W/O
624460
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00550
PipeID
P24177
Time
2:34 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4383
Sewer Name
29 WEST HILL STREET SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
03
Purpose
Routine Assessment
Project
WO_624460_TV29035_MAR2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
29 0270
Downstream MH
29 0271
Dir. of Survey
Upstream
Length Surveyed
223.8 ft.
Total Length
223.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 29 0270 to 29 0271
MH: 29 0270MH: 29 0271upstream0 ft. MSA - Survey Abandoned - END OF PIPE0 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6"7.8 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"10.9 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"13.5 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 6"30.6 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6"53.5 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"107.1 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"115.5 ft. TBA - Tap Break-In Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"155.5 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"209 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"223.8 ft. MGO - Reversal Inspection223.8 ft. MWL - Water Level, 5 %of cross sectional area223.8 ft. MWM - Water Mark, 5 %of cross sectional area223.8 ft. AMH - Downstream Manhole, Survey Begins - 29 0270

Observation photos (2)

  • Tap Break-In Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"

    108.3 ft. - Tap Break-In Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6"

    223.8 ft. - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6"

Observations (15)

DistanceCodeObservation
0MGO
116.7TFC
0MWL
216TFC
108.3TBA
223.8MSAEND OF PIPE
0MWM
170.3TFC
14.8TFC
0AMH29 0270
210.3TF
212.9TF
223.8TF
68.3TFC
193.2TF

Properties (4)

additional_info
SC306892
custom_field_two
4
customer
LACSD
datetime
2017-03-17T02:34:03-07:00