Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 25, 2017, 08:05 AM
  • 22 0980_22 0979_25082017_012214.mp4

Date
08/25/2017
W/O
651862
Weather
Dry
Operator/Surveyor
JUAN B
Sewer ID
Z00790
PipeID
P17350
Time
1:05 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K4700
Sewer Name
22 BASE LINE TRUNK
City
GLENDORA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
12
Purpose
Routine Assessment
Project
WO_651862_TV22001_AUG2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0979
Downstream MH
22 0980
Dir. of Survey
Upstream
Length Surveyed
178.6 ft.
Total Length
178.6 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2F00
O&M Rating
70
Overall Index
2
Overall Quick
Overall Rating
70
Pipe schematic from manhole 22 0979 to 22 0980
MH: 22 0979MH: 22 0980upstream0 ft. MSA - Survey Abandoned - REVERSAL COMPLETE0 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish28.5 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 4"57.7 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"60.3 ft. TBA - Tap Break-In Active, at 03 o'clock, -, within 8 inches of joint: NO, 4"75.2 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 4"122.1 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 4"132.6 ft. MGO - General Observation - BROKEN "JOINT"133.4 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 4"175.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start178.6 ft. MWL - Water Level, 20 %of cross sectional area178.6 ft. MWM - Water Mark, 30 %of cross sectional area178.6 ft. MGO - Reversal Inspection178.6 ft. AMH - Downstream Manhole, Survey Begins - 22 0979

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - BROKEN "JOINT"

    46 ft. - General Observation - BROKEN "JOINT"

Observations (15)

DistanceCodeObservation
178.6MSAREVERSAL COMPLETE
178.6TFC
0MWL
0MWM
118.3TBA
0MGO
45.2TF
103.4TFC
3DAGS
46MGOBROKEN "JOINT"
0AMH22 0979
120.9TFC
178.6DAGS
56.5TF
150.1TFC

Properties (4)

additional_info
SC345639
custom_field_two
3
customer
LACSD
datetime
2017-08-25T01:05:30-07:00