Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 29, 2017, 05:55 AM
Date
09/28/2017
W/O
663060
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00659
PipeID
P13600
Time
10:55 PM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4281
Sewer Name
16 LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
15
Purpose
Routine Assessment
Project
WO_663060_TV16078_OCT2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
16 0549
Downstream MH
16 0548
Dir. of Survey
Downstream
Length Surveyed
230.3 ft.
Total Length
230.3 ft.
Structural Index
3
Structural Quick
3H00
Structural Rating
135
O&M Index
2
O&M Quick
2H11
O&M Rating
93
Overall Index
2
Overall Quick
Overall Rating
228
Pipe schematic from manhole 16 0549 to 16 0548
MH: 16 0549MH: 16 0548downstream0 ft. AMH - Upstream Manhole, Survey Begins - 16 05490 ft. VC - Vermin Cockroach0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area2.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start2.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.9 ft. MGO - General Observation - MAG COAT START40.4 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"44.2 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"84.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"88.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"128.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"133.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"177.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"181.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"230.3 ft. MGO - General Observation - MAG COAT FINISH230.3 ft. AMH - Downstream Manhole, Survey Ends - 16 0548230.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish230.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2.8 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
84.8TFC
88.7TFC
177.8TFC
0AMH16 0549
0VC
2.8DAGS
230.3MGOMAG COAT FINISH
230.3AMH16 0548
2.9SAV
230.3SAV
133.1TFC
230.3DAGS
40.4TBA
44.2TBA
0MWL
128.9TFC
2.9MGOMAG COAT START
181.7TFC
0MWM

Properties (4)

additional_info
SC352127
custom_field_two
3
customer
LACSD
datetime
2017-09-28T22:55:52-07:00