Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 20, 2017, 04:36 AM
  • 14 0197_14 0196 _09192017_213825.mp4

Date
09/19/2017
W/O
657830
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00584
PipeID
P18236
Time
9:36 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4729
Sewer Name
14 WEST SIDE TRUNK
City
LANCASTER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
18
Purpose
Routine Assessment
Project
WO_657830_TV14033_SEP2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
14 0197
Downstream MH
14 0196
Dir. of Survey
Downstream
Length Surveyed
287.3 ft.
Total Length
287.3 ft.
Structural Index
3
Structural Quick
3200
Structural Rating
6
O&M Index
2
O&M Quick
412J
O&M Rating
118
Overall Index
2
Overall Quick
Overall Rating
124
Pipe schematic from manhole 14 0197 to 14 0196
MH: 14 0197MH: 14 0196downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 6 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 14 01972 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start9.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start12.5 ft. TBA - Tap Break-In Active, at 03 o'clock, -, within 8 inches of joint: NO, 4"15.4 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 4"45 ft. MGO - General Observation - POSSIBLE SAG, START65 ft. MGO - General Observation - POSSIBLE SAG, FINISH78.4 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 4"142.3 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 4"187.5 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: YES, 4"208.7 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 4"268.7 ft. TBA - Tap Break-In Active, at 03 o'clock, -, within 8 inches of joint: NO, 4"285.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish285.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish287.3 ft. AMH - Downstream Manhole, Survey Ends - 14 0196

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    9.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
285.3CM
2DAGS
285.3DAGS
287.3AMH14 0196
15.4TFC
208.7TFA
268.7TBA
45MGOPOSSIBLE SAG, START
9.5CM
0MWL
0MWM
187.5TFA
0MGOACTIVE CONNECTION AT MH 6 O'CLOCK
78.4TFA
65MGOPOSSIBLE SAG, FINISH
12.5TBA
142.3TFA
0AMH14 0197

Properties (4)

additional_info
SC345742
custom_field_two
3
customer
LACSD
datetime
2017-09-19T21:36:14-07:00