Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 4, 2018, 11:50 AM
  • Section#4_08 0464_08 0463__942018__I0060.mp4

Date
09/04/2018
W/O
0717855
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00026
PipeID
P00520
Time
4:50 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0060
Sewer Name
08 216TH STREET TRUNK
City
TORRANCE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
10
Purpose
Capital Improvement Program Assesment
Project
20180904MDM_216TH_STREET_TRUNK
Material
RCP-CTL
Shape
Circular
Height
36 in.
Upstream MH
08 0464
Downstream MH
08 0463
Dir. of Survey
Downstream
Length Surveyed
245.4 ft.
Total Length
245.4 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 08 0464 to 08 0463
MH: 08 0464MH: 08 0463downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - MH CONN 6:00 ACTIVE0 ft. MGO - General Observation - MH CONN 9:00 STUB0 ft. AMH - Upstream Manhole, Survey Begins - 4:50AM0 ft. MWL - Water Level, 40 %of cross sectional area2 ft. MLC - Lining Change, Other (enter details in Field 39) - HOBAS PIPE LINER START15.7 ft. MGO - General Observation - PROTRUDING LINER MATERIAL 10:0025.9 ft. MGP - General Photograph42.5 ft. MWM - Water Mark, 20 %of cross sectional area42.5 ft. MWL - Water Level, 10 %of cross sectional area127.7 ft. MGO - General Observation - HOBAS PIPE LINER233.9 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 8" - ACTIVE245.4 ft. AMH - Downstream Manhole, Survey Ends - 5:10AM

Observation photos (5)

  • Lining Change, Other (enter details in Field 39) - HOBAS PIPE LINER START

    2 ft. - Lining Change, Other (enter details in Field 39) - HOBAS PIPE LINER START

  • General Observation - PROTRUDING LINER MATERIAL 10:00

    15.7 ft. - General Observation - PROTRUDING LINER MATERIAL 10:00

  • General Photograph

    25.9 ft. - General Photograph

  • Water Mark, 20 %of cross sectional area

    42.5 ft. - Water Mark, 20 %of cross sectional area

  • General Observation - HOBAS PIPE LINER

    127.7 ft. - General Observation - HOBAS PIPE LINER

Observations (13)

DistanceCodeObservation
25.9MGP
0MWL
127.7MGOHOBAS PIPE LINER
0MGOMH CONN 6:00 ACTIVE
0MGOMH CONN 9:00 STUB
42.5MWM
2MLCHOBAS PIPE LINER START
0AMH4:50AM
233.9TBACTIVE
0MWL
15.7MGOPROTRUDING LINER MATERIAL 10:00
42.5MWL
245.4AMH5:10AM

Properties (4)

custom_field_three
HOBAS PIPE LINER
custom_field_two
4
customer
LACSD
datetime
2018-09-04T04:50:00-07:00