Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 24, 2018, 11:02 AM
  • B 0613_B 0612 _24072018_041409.mp4

Date
07/24/2018
W/O
718359
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00105
PipeID
P09185
Time
4:02 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5879
Sewer Name
B JOINT OUTFALL B - UNIT 8B
City
TEMPLE CITY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
16
Purpose
Routine Assessment
Project
WO_718359_TV15227_AUG2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
B 0613
Downstream MH
B 0612
Dir. of Survey
Downstream
Length Surveyed
370 ft.
Total Length
370 ft.
Structural Index
3
Structural Quick
3N2F
Structural Rating
291
O&M Index
2
O&M Quick
312N
O&M Rating
149
Overall Index
2
Overall Quick
Overall Rating
440
Pipe schematic from manhole B 0613 to B 0612
MH: B 0613MH: B 0612downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 06130 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start13.4 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES - DEBRIS163.4 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 4"188.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start368.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish368.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish368.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish370 ft. MGO - General Observation - ROACHES IN MH370 ft. AMH - Downstream Manhole, Survey Begins - B 0612

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    188.7 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
2SAP
368.5DAGS
0MWM
163.4TBA
13.4DSZDEBRIS
370MGOROACHES IN MH
0AMHB 0613
370AMHB 0612
368.5SAP
0MWL
188.7SSS
368.5SSS
2DAGS

Properties (4)

additional_info
SC359747
custom_field_two
2
customer
LACSD
datetime
2018-07-24T04:02:51-07:00