Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 27, 2018, 08:06 AM
  • 32 1169_32 1168 _27072018_011744.mp4

Date
07/27/2018
W/O
717961
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00839
PipeID
P19623
Time
1:06 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5882
Sewer Name
32 SAN FERNANDO ROAD TRUNK
City
SANTA CLARITA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
WO_717961_TV32021_AUG2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 1169
Downstream MH
32 1168
Dir. of Survey
Downstream
Length Surveyed
405 ft.
Total Length
405 ft.
Structural Index
3
Structural Quick
3O2M
Structural Rating
384
O&M Index
2
O&M Quick
312T
O&M Rating
211
Overall Index
2
Overall Quick
Overall Rating
595
Pipe schematic from manhole 32 1169 to 32 1168
MH: 32 1169MH: 32 1168downstream0 ft. AMH - Upstream Manhole, Survey Begins - 32 11690 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start38.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"45 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start58.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"97 ft. RMJ - Roots Medium Joint, from 04 to 08 o'clock, 15 %, within 8 inches of joint: YESR223.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"228.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"279.3 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS399.3 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish403.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish403.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish403.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish405 ft. AMH - Downstream Manhole, Survey Ends - 32 1168405 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    45 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Roots Medium Joint, from 04 to 08 o'clock, 15 %, within 8 inches of joint: YESR

    97 ft. - Roots Medium Joint, from 04 to 08 o'clock, 15 %, within 8 inches of joint: YESR

Observations (18)

DistanceCodeObservation
2SAP
403.2SAP
228.3TFC
0AMH32 1169
403.2DAGS
58.7TFC
2DAGS
223.9TFA
279.3DSZDEBRIS
403.2SSS
97RMJ
0MWL
405AMH32 1168
399.3DSZ
38.6TFC
405MGOACTIVE CONNECTION AT MH 3 O'CLOCK
0MWM
45SSS

Properties (4)

additional_info
SC359750
custom_field_two
2
customer
LACSD
datetime
2018-07-27T01:06:23-07:00