Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 27, 2018, 05:08 AM
  • 32 1174_32 1173 _26072018_223528.mp4

Date
07/26/2018
W/O
717961
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00839
PipeID
P19628
Time
10:08 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5882
Sewer Name
32 SAN FERNANDO ROAD TRUNK
City
SANTA CLARITA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
WO_717961_TV32021_AUG2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 1174
Downstream MH
32 1173
Dir. of Survey
Downstream
Length Surveyed
596.2 ft.
Total Length
596.2 ft.
Structural Index
3
Structural Quick
3W00
Structural Rating
354
O&M Index
2
O&M Quick
2W00
O&M Rating
236
Overall Index
3
Overall Quick
Overall Rating
590
Pipe schematic from manhole 32 1174 to 32 1173
MH: 32 1174MH: 32 1173downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - MAG COATING THROUGHOUT 70%0 ft. AMH - Upstream Manhole, Survey Begins - 32 11740 ft. MWL - Water Level, 15 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start35.1 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"56.3 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"156.3 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"164.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"274.7 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"390.7 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"503.4 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"594.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish594.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish596.2 ft. AMH - Downstream Manhole, Survey Ends - 32 1173

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
390.7TBA
156.3TB
503.4TBA
0MWM
35.1TBA
596.2AMH32 1173
0MGOMAG COATING THROUGHOUT 70%
0AMH32 1174
594.1SAP
56.3TBA
2DAGS
164.6TFC
594.1DAGS
274.7TBA
0MWL
2SAP

Properties (4)

additional_info
SC359750
custom_field_two
2
customer
LACSD
datetime
2018-07-26T22:08:52-07:00