Wastewater/Activity/PacpInspection/1.0Jul 27, 2018, 09:39 AM
  • 32 1166_32 1165_27072018_024623.mp4

Date
07/27/2018
W/O
717961
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00839
PipeID
P19620
Time
2:39 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5882
Sewer Name
32 SAN FERNANDO ROAD TRUNK
City
SANTA CLARITA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
WO_717961_TV32021_AUG2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 1165
Downstream MH
32 1166
Dir. of Survey
Upstream
Length Surveyed
170.3 ft.
Total Length
170.3 ft.
Structural Index
3
Structural Quick
3B00
Structural Rating
39
O&M Index
2
O&M Quick
2F00
O&M Rating
66
Overall Index
2
Overall Quick
Overall Rating
105
Pipe schematic from manhole 32 1165 to 32 1166
MH: 32 1165MH: 32 1166upstream0 ft. AMH - Upstream Manhole, Survey Ends - 32 11661.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish101.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish101.6 ft. MMC - Material Change, Vitrified clay pipe135 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"168.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start168.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start170.3 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK170.3 ft. MWL - Water Level, 10 %of cross sectional area170.3 ft. AMH - Downstream Manhole, Survey Begins - 32 1165170.3 ft. MWM - Water Mark, 25 %of cross sectional area

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Material Change, Vitrified clay pipe

    68.7 ft. - Material Change, Vitrified clay pipe

Observations (11)

DistanceCodeObservation
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
168.9DAGS
35.3TFC
0MWL
2DAGS
2SAP
68.7SAP
170.3AMH32 1166
0AMH32 1165
68.7MMC
0MWM

Properties (4)

additional_info
SC359750
custom_field_two
2
customer
LACSD
datetime
2018-07-27T02:39:58-07:00