Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 27, 2018, 10:05 AM
  • 32 1163_32 1162_27072018_031105.mp4

Date
07/27/2018
W/O
717961
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00839
PipeID
P19617
Time
3:05 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5882
Sewer Name
32 SAN FERNANDO ROAD TRUNK
City
SANTA CLARITA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
WO_717961_TV32021_AUG2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 1163
Downstream MH
32 1162
Dir. of Survey
Downstream
Length Surveyed
140.6 ft.
Total Length
140.6 ft.
Structural Index
3
Structural Quick
3D2D
Structural Rating
135
O&M Index
2
O&M Quick
2D00
O&M Rating
54
Overall Index
2
Overall Quick
Overall Rating
189
Pipe schematic from manhole 32 1163 to 32 1162
MH: 32 1163MH: 32 1162downstream0 ft. AMH - Upstream Manhole, Survey Begins - 32 11630 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start138.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish138.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish138.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish140.6 ft. AMH - Downstream Manhole, Survey Ends - 32 1162

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    3.2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
0AMH32 1163
138.2SAP
0MWL
140.6AMH32 1162
2DAGS
138.2DAGS
3.2SSS
2SAP
0MWM
138.2SSS

Properties (4)

additional_info
SC359750
custom_field_two
2
customer
LACSD
datetime
2018-07-27T03:05:18-07:00